Checking off the “To Do” list

So while I have been playing around in the galley Steve has been doing all the real work.

The shiny new diesel tank came back and after a minor modification (the addition of a couple tabs welded to to the top so it could actually be secured beneath the floor, who’d have thunk!) and it was successfully re-installed. Over the last couple years it seems like we’ve repaired or replaced almost every major system on board. Hopefully this is one of the last big hurdles so in commemoration we decided to sign and date the tank, literally putting our personal stamp on things. And with the newly varnished floor boards put back down, and the game of ‘don’t fall in the hole’ over, things inside are almost back to normal.

Giddy Up!

Giddy Up!

wpid-img_20141124_152241.jpg

Delivered, Sealed and Signed

 

 

 

 

 

 

 

Continue reading

Advertisements